Sanitary Connections

This service is provided by the Ministry of Works to Individuals, Businesses, Governmental Entities, and NGOs requesting to connect the sewage network to residential, commercial, and industrial buildings.

Required Attachments

  • Real estate document/ survey certificate (if any).
  • Aerial map of the property (in the absence of a survey certificate).
  • A drawing of the property's boundaries with an explanation of the existing and proposed health connections.
  • A copy of the CPR card from both sides.
  • The address card of the property to be connected.
  • A copy of the building permit.
  • A copy of the establishment's commercial register.
  • Pictures of the building and the connection pipes to the public sewage network.
  • Any previous correspondence with the Sanitation Planning and Projects Department regarding the connection request.

Process Time

  • 2-4 Months

Service Provider

Ministry of Works

Cooperative Entities

  • Electricity and Water Authority
  • Ministry of Interior
  • Bahrain Authority for Culture and Antiquities
  • Telecommunications Regulatory Authority
  • Ministry of Municipalities Affairs and Agriculture

Service Processes

  • Applicant: Submit the request through one of the approved channels to submit these requests
  • Ministry of Works: Upon receiving the request, the customer is provided with the request number of the request
  • Ministry of Works: In case that the application does not have all the required documents and technical information, the applicant will be contacted to complete the missing documents and/or technical information.
  • Ministry of Works: The technical possibility of connecting the facility to the public sewage network is studied by the Home Connections Unit in coordination with those concerned with the sanitary sector. After the request is approved, a text message is sent via the mobile phone to the requester accepting the request and its number.
  • Ministry of Works: The order is transferred directly to the design department, to prepare the necessary drawings for the connection.
  • Ministry of Works :The file is transferred to the construction department after preparing the drawings required for connection to be included in the implementation program after completing the necessary licensing procedures, and then the building is connected to the sewage network.

  • Applicant: Submit the request through one of the approved channels to submit these requests
  • Ministry of Works: Upon receiving the request, the customer is provided with the request number of the request
  • Ministry of Works: In case that the application does not have all the required documents and technical information, the applicant will be contacted to complete the missing documents and/or technical information.
  • Ministry of Works: The technical possibility of connecting the facility to the public sewage network is studied by the Home Connections Unit in coordination with those concerned with the sanitary sector. After the request is approved, a text message is sent via the mobile phone to the requester accepting the request and its number.
  • Ministry of Works: The order is transferred directly to the design department, to prepare the necessary drawings for the connection.
  • Ministry of Works :The file is transferred to the construction department after preparing the drawings required for connection to be included in the implementation program after completing the necessary licensing procedures, and then the building is connected to the sewage network.