Service Directory
Issuance of Permits for Various Road Works
Road Works Permit: For example, but not limited to (road maintenance and development, drainage maintenance, infrastructure utility installation) - Emergency Works Permit: For example, but not limited to (pipe maintenance, cable maintenance, pothole repair, and other urgent non-deferrable works) - Off-Street Work Permit: For example, but not limited to (road construction, water pipeline installation, electrical and cable network installations, etc.) - Special Works Permits: For example, but not limited to (construction, demolition, concrete pouring, prefabricated roof installation, and maintenance works)
Service Conditions
- Approval and permit from the Roads Directorate at the Ministry of Works and other required approvals depending on the location (for emergency works if applicable).
- Municipal approval for off-street work requests (Way Leaves).
- Notification from the government entity for emergency works.
- Settlement of all fines, violations, and traffic accidents (if any).
Required Attachments
- Personal ID card
- A letter from the applicant, whether a company, institution, or individual (for private work requests), stating the work details, location, and responsible person.
- Site map and traffic diversion plans showing the work location, road closure method, and traffic signs in place during the closure.
Legal Regulations
- Law No. (23) of 2014 issuing the Traffic Law
- Minister of Interior Decision No. (154) of 2015 issuing the executive regulations for the Traffic Law promulgated by Law No. (23) 2014, and its amendments
- Ministerial Resolution No. (309) of 1998 regarding the replacement of fees for the services of the General Directorate of Traffic
Fees
- 6 BHD : Prescribed fee for issuing certificates of various types
- 3 BHD : If the work requires the arrangement of traffic officers, a fee of 3 BHD per officer per hour is charged for traffic arrangements, if necessary (excluding off-street works).
Payment Methods
- Debit Card
- Credit Card
- Cash (TAM Kiosk)
Process Time
- 1 : One working day
Service Provider
Ministry of Interior - General Directorate of Traffic
Cooperative Entities
- Ministry of Works
- Ministry of Municipalities Affairs and Agriculture