Service Directory
Licensing the maps of buildings that contain between eight to ten apartments
Auditing the engineering designs of projects and ensuring their compliance with the requirements of fire protection and safety
Required Attachments
- A copy of the ID card
- A copy of the property
- Fill out the original pledge form
- Address
Legal Regulations
- Ministerial Edict No. (167) of 2002
Fees
- 80 BD
Process Time
- 14 Working Days
Service Provider
Ministry of Interior - General Directorate of Civil Defense
Service Processes
- Receiving an electronic licensing application number from the comprehensive municipal center or from one of the municipalities outside the center by e-mail.
- The employee enters the application number in the comprehensive licensing system to view the documents to identify the project and basic data.
- The submitted engineering drawings are reviewed according to the building classification to compare them with the book of requirements for fire prevention and protection in the facilities.
- The modifications to the drawings are clarified and sent to the engineering office through the system or a request for the engineer to attend to explain and discuss the required modification.
- After the request is returned, the employee re-checks and ensures that the civil defense requirements are met on the drawings. The maps are commented on and the document for setting protection and safety requirements is filled out (an internal document for setting safety requirements for buildings).
- The clerk enters the application into the file system to give it a file number, issue number, seal of the document and architectural maps of the application.
- They are transferred along with the registration of applications in the correspondence system for ready projects to be presented to the manager/branch chief/department delegates to sign and after checking the requirements and drawings, the certified projects are returned to the clerk at the Municipal Comprehensive Center.
- The writer records the date of return of requests in the correspondence system.
- The delegate enters the service fees and approves the approval of the project in the licensing system.
- The employee scans to keep an electronic copy of the project and sends it through the licensing system of the engineering office.
- Payment of fees.