Service Directory

Review and Approval of Hydro-Dynamic Studies

Review of hydrodynamic studies and assessments carried out by qualified consultancy engineering firms on behalf of individuals or organizations which aims to assess various engineering applications and development works taking place within coastal and marine areas and identify any potential impacts on hydrodynamic processes as well as any necessary mitigations or preventive measures.

Service Conditions

  • The study should be for reclamation projects
  • The study should be for waterfront development projects
  • The study should be for water canal projects and marine protection areas for power and water desalination plants

Required Attachments

  • A copy of the title deed.
  • A copy of the latest survey certificate.
  • An electronic copy of the report (PDF)showing the effect of tamping on the hydrodynamic situation.
  • An electronic copy of the project’s master plan map and a map showing the boundaries of the reclamation in pdf format (dgn, cad or shape).
  • The contact details of the consulting company that prepared the hydro-dynamic study (direct contact number and email).
  • A copy of the owner's smart card (both sides) or a copy of the commercial.
  • A letter from the owner or authorized applicant addressed to the Urban Planning and Development Authority requesting a hydro-dynamic studies assessment. If the applicants are heirs, the letter must be signed by all of them.
  • Data of the consulting company prepared for the hydrodynamic study. (Direct contact number and e-mail).

If the land includes water channels

  • A cross-sectional map of the water channels in PDF format and one in one of the following formats: DGN, CAD or SHAPE.

If the applicant is a company

  • A copy of the Commercial Register of Companies and Companies with the Registry Extracts among those authorized to sign.
  • A copy of the authorization letter.
  • The authorized person’s smart card (authorized to follow up on the application).

If the applicants are heirs

  • A copy of the legal obligation
  • An authorization letter signed by the heirs.
  • Smart card copies of all legitimate heirs.

If the applicant is authorized to represent the owner

  • A copy of the authorization letter
  • The authorized person’s smart card.

Legal Regulations

  • Decision No. (16) of 2005 regarding the prohibition of backfilling (reclamation) lands with marine waters without a license

Process Time

  • 25 Working Days

Service Provider

Urban Planning and Development Authority

Service Processes

  • Fill out the application form
  • Submit the required documents
  • Submit the application via the website, email or attending in person
  • Study the application
  • Coordinate with the relevant entities (if required)
  • Notify the applicant of the result
Is this page useful to you?
Share your feedback so we can improve your experience.
Go to top
Chat Icon
Complementary Content
${loading}