Service Directory

Licensing maps of hotels and furnished apartments

Auditing the engineering designs of projects and ensuring their compliance with the requirements of fire protection and safety

Required Attachments

  • A copy of the identity card
  • A copy of the property
  • Fill out the original pledge form
  • Address

Legal Regulations

  • Ministerial No. (100) of 2016 determining the categories of fees payable for certificates, reports and licenses issued by the General Administration of Civil Defense

Fees

  • 300 BD

Process Time

  • 14 Working Days

Service Provider

Ministry of Interior - General Directorate of Civil Defense

Service Processes

  • Receiving an electronic licensing application number from the comprehensive municipal center or from one of the municipalities from outside the center by e-mail
  • The employee enters the application number in the comprehensive licensing system to view the documents to identify the project and basic data.
  • The submitted engineering drawings are reviewed according to the building classification to compare them with the book of requirements for fire prevention and protection in the facilities.
  • The modifications to the drawings are clarified and sent to the engineering office through the system or a request for the engineer to attend to explain and discuss the required modification.
  • After returning the request, the employee re-checks and ensures that the requirements of the Civil Defense are fulfilled on the drawings. The maps are commented on, and the document is filled out (an internal document for setting safety requirements for buildings) No. for setting protection and safety requirements. Branch.
  • The clerk enters the application into the file system to give him a file number, issue number, seal of the document and architectural maps of the application.
  • They are transferred along with the registration of applications in the correspondence system for ready projects to be presented to the manager/branch chief/department delegates to sign and after checking the requirements and drawings, the certified projects are returned to the clerk at the Municipal Comprehensive Center.
  • The writer records the date of return of requests in the correspondence system.
  • The employee certifies the approval of the project in the licensing system.
  • The employee scans to keep an electronic copy of the project and sends it through the licensing system of the engineering office.
  • Payment of fees.
Go to top
Chat Icon
Complementary Content
${loading}